Caltrans plans major roadwork through Nov. 26

NORTH COAST, Calif. – Caltrans reports that the following road projects will be taking place around the North Coast during the coming week.

Included are Mendocino County projects that may impact Lake County commuters.

Caltrans will suspend work on Northern California highways from Wednesday, Nov. 25, through Sunday, Nov. 29, in observance of the Thanksgiving Holiday.

However, due to unforeseen circumstances, it may be necessary for Caltrans Maintenance forces to respond to emergency situations.
 
LAKE COUNTY

Highway 20

– Installation of a roundabout at the junction of Routes 20/29 will continue. One-way traffic control will be in effect from 10 p.m. to 6 a. m., weekdays. Motorists should anticipate five-minute delays.

– Pavement repairs from Rosemont Drive to the junction of Routes 20/53 will continue. One-way traffic control will be in effect from 6 p.m. to 6 a.m., or from 7 a.m. to 3 p.m., weekdays. Motorists should anticipate 15-minute delays.

– Rocky Fire repairs from Gravel Plant Road to the Lake/Colusa County line will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m., weekdays. Motorists should anticipate five-minute delays.
 
Highway 29

– Valley fire cleanup from the Lake/Napa County line to Hidden Valley will continue. One-way traffic control will be in effect from 6:30 a.m. to 7 p.m. seven days per week. Motorists should anticipate 15-minute delays.
 
– Pavement repairs from Main Street in Kelseyville to the junction of Routes 29/175 near Lakeport will continue. One-way traffic control will be in effect from 6 p.m. to 6 a.m., weekdays. Motorists should anticipate 15-minute delays.
 
– Installation of a roundabout at the junction of Routes 20/29 will continue. One-way traffic control will be in effect from 10 p.m. to 6 a. m., weekdays. Motorists should anticipate five-minute delays.

Highway 175

– Fire recovery work from the junction of Routes 29/175 in Middletown to Loch Lomond will continue. One-way traffic control will be in effect from 6:30 a.m. to 7 p.m., 7 days per week. Motorists should anticipate 30-minute delays.

Highway 281

– PG&E has been granted a Caltrans encroachment permit for utility repairs 1.0 mile north of the junction of Routes 29/281 on Monday, Nov. 23. One-way traffic control will be in effect from 8 a.m. to 10 a.m. Motorists should anticipate five-minute delays.

MENDOCINO COUNTY

Highway 1

– Highway repairs just north of Ocean Meadows Circle will continue. One-way traffic control with a temporary signal will be in effect 24 hours per day, seven days per week. Motorists should anticipate five-minute delays.

Highway 20
 
 – Guardrail repairs at the junction of Routes 1/20 will begin Monday, Nov. 23. One-way traffic control will be in effect from 7 a. m. to 5 p. m., weekdays. Motorists should anticipate five-minute delays.
 
Highway 101

– Caltrans will perform slide repairs near the Korean War Veterans Memorial Bridge (near Frog Woman Rock). Northbound traffic will be restricted to one lane 24 hours per day, seven days per week. Motorists may experience minor traffic slowdowns.

– Pavement repairs from 0.3 miles north of Nelson Road to the Route 101/253 interchange will continue. Work hours are 7 a.m. to 6 p.m., weekdays. In two-lane sections, one-way traffic control will be in effect, and motorists should anticipate 15-minute delays. In four-lane sections, traffic will be restricted to one lane in each direction, and motorists should anticipate minor traffic slowdowns. At the Robinson Overcrossing and El Roble Overcrossing interchanges, ramps will be intermittently closed, and motorists should seek an alternate route. No consecutive offramps or onramps will be closed at the same time.
 
– Highway construction from Sherwood Road to the north Willits railroad crossing will continue. Intermittent one-way traffic control will be in effect from 7 a.m. to 6 p.m., weekdays. Motorists should anticipate five-minute delays.
 
– Bridge rehabilitation at the Arnold Bridge Overcrossing will continue through Friday, Nov. 20. Traffic will be restricted to one lane in each direction from 6 a.m. to 6 p.m., weekdays. Motorists should anticipate minor traffic slowdowns.
 
– Pavement repairs from Harwood Road to Rattlesnake Creek will continue. One-way traffic control will be in effect from 7 a.m. to 6 p.m., Monday through Saturday. Motorists should anticipate 15-minute delays.
 
– Bridge rehabilitation at the Bridges Creek Bridge will continue. One-way traffic control will be in effect from 6 a.m. to 6 p.m., weekdays. Motorists should anticipate five-minute delays.
 
– Bridge rehabilitation at various South Fork Eel River Bridges from Piercy to the Humboldt/Mendocino County line will continue through Friday, Nov. 20. Traffic will be restricted to one lane in each direction from 6 a.m. to 6 p.m., weekdays. Motorists should anticipate minor traffic slowdowns.
 
Highway 175

– PG&E has been granted a Caltrans encroachment permit for tree trimming from Route 101 to the Lake/Mendocino County line through Friday, Nov. 20. One-way traffic control will be in effect from 8 a.m. to 5 p.m., weekdays. Motorists should anticipate five-minute delays.

Highway 271

– Bridge rehabilitation at the McCoy Creek Bridge will continue. One-way traffic control will be in effect from 6 a.m. to 3 p.m., weekdays. Motorists should anticipate five-minute delays.
 
The Caltrans Traffic Operations Office has reviewed each project and determined that individual project delays are expected to be less than the statewide policy maximum of 30 minutes, unless noted otherwise above.

For information pertaining to emergency roadwork or for updates to scheduled roadwork, please contact the California Highway Information Network (CHIN) at 1-800-GAS-ROAD (1-800-427-7623).

LCNews

Award winning journalism on the shores of Clear Lake. 

 

Search